Set Up Corporate Email (Exchange Activesync) - DROID CHARGE™ by SAMSUNG

Note Contact the Exchange/IT administrator for assistance with server information and credentials.

  1. From the home screen, select Applications.
    Home screen with Applications
  2. Select Settings.
    Applications with Settings
  3. Select Accounts & sync.
    Settings with Accounts & sync
  4. Select Add account.
    Accounts & sync with Add account
  5. Select Corporate (Exchange ActiveSync®).
    Add an account with Corporate
  6. Enter the appropriate Email address and Password then select Next.
    Email address and Password with Next
  7. Enter the appropriate information into the following fields:
    • Domain
    • Username
    • Password
    • Exchange server
    Exchange server settings
  8. Ensure the following settings are configured as appropriate then select Next:
    Note Enabled when a orange check mark is present.
    • Use secure connection (SSL)
    • Accept all SSL certificates
    Exchange server settings with Next
  9. If presented, select OK.
    Remote security administration with OK
  10. From the Peak time schedule field, select the current setting.
    Peak time schedule field
  11. Select one of the following settings:
    • Push
    • Manual
    • 5 minutes
    • 15 minutes
    • 1 hour
    • 4 hour
    • 12 hour
    Peak time schedule settings
  12. From the Off-peak time schedule field, select the current setting.
    Off-peak time schedule field
  13. Select one of the following settings:
    • Push
    • Manual
    • 5 minutes
    • 15 minutes
    • 1 hour
    • 4 hour
    • 12 hour
    Off-peak time schedule settings
  14. Select any of the following settings then select Next:
    Note Enabled when a orange check mark is present.
    • Notify me when email arrives.
    • Sync Email
    • Sync contacts
    • Sync calendar
    Account options with Next
  15. If desired, enter an account name then select Done.
    Optional account name with Done
  16. If presented Activate device administrator, select Activate.
    Activate device administrator screen with Activate
  17. If presented, select Password.
    Settings with Password
    1. Enter a password then select Continue.
      Password screen with Continue
    2. Re-enter the password then select OK.
      Confirm password with OK